HVDC Convertor Station, Spital, Caithness – Electrical Protection & Control Cabling

How we helped

Electrical Services were requested to provide specialist labour to assist the final termination & connection of all protection & control equipment within multiple control rooms & HVDC sub-station areas through-out the project.

Services provided by R&A included termination & connection of various specifications of AC & DC systems control cabling c/w integral earthing requirements at multiple control panels & numerous types of field located sub-station equipment. Due to our performance on both sites, R&A were requested to assist with the termination & OTDR testing of the fibre-optic cabling installation, which were carried out by R&A’s fibre-optic technician.

This phase of the project required working in very close partnership with all the relevant stakeholders including the site project team to ensure the successful completion of these works to accommodate ABB commissioning dates, which were successfully met at all stages.

HVDC Convertor Station, Spital, Caithness – Electrical Protection & Control Cabling

Client – Amey Utilities

Main Contractor – ABB

Sub-Station Operator – SSE

Value – £130K

Dates – April-Sept 2018

Scottish Water

Fairmilehead Phase 2 – Contact Centre Relocation - Edinburgh

Appointed principal contractor in November 2016 our task was to undertake the full bu...

Scottish Water

Galafoot Water Depot - Galashiels

Building on our relationship with Scottish Water to upgrade their Depot Facility in G...

Get in Touch

Don't waste time - call us now on 01698 200300 for a free no obligation survey/quotation

Privacy Preference Center

    Scroll To Top