Whinhill WPS to Dougliehill High DSR – Installation of Fibre-Optic Communication Link

How we helped

Electrical Services were requested to carry out installation of fibre-optic cabling requirements to link an existing water pumping station to an existing service reservoir pumping station, thus allowing the de-commission from service of two further pumping stations located between both sites.

This project required the installation of 10,000 metres of SWA OS2 grade fibre-optic cable fully within ground ducted systems inclusive of full termination via multiple IP68 fibre-optic junction boxes. These works were carried out through very demanding terrain over various sections of farm-land, main carriageways & housing estate street networks.

This project required working in very close partnership with all the relevant stakeholders due to multiple road traffic controls required. R&A appointed a specialist cabling installer to assist in minimizing required road closures through-out the project. We also appointed a specialist fibre-optic engineer to assist in the final testing & certification of these works, due to the increased cable lengths & multiple number cable-joints required through-out the installation.

This project proved to be a major success, achieved through a basis of teamwork & a determination to hand-over an operational system to our client, which would not have been achievable with-out these qualities.

Whinhill WPS to Dougliehill High DSR – Installation of Fibre-Optic Communication Link

Client – Ferrier Pumps

Main Contractor – Caledonian Water Alliance

Utility Provider – Scottish Water

Value – £90K

Dates – Feb-May 2018

R&A focus on working in partnership with our clients to provide appropriate solutions, utilising our own workforce & long-term service providers to meet the demands of varied project requirements.

For more information contact us via our Enquiry Form

Scottish Water

Fairmilehead Phase 2 – Contact Centre Relocation - Edinburgh

Appointed principal contractor in November 2016 our task was to undertake the full bu...

Scottish Water Lincluden

New Build Storage Unit. Value - £300K

R&A Group Ltd was commissioned to act as the principal contractor for the new bui...

Get in Touch

Don't waste time - call us now on 01698 200300 for a free no obligation survey/quotation